Tuesday, 3 January 2006

I Got Flooring Up the Ying Yang

Here are the pics of the top floor that I've been promising for a while. It took way longer than it should because the contractor that I fired (The Plumbing Monkey) really screwed up the floor. He pulled up a the 1" thick planks in the hall and laid down plywood that was only 1/2" thick. He also didn't level the floor enough. I didn't want to pay him to re-do it because the odds of him being

No comments:

Post a Comment